“Today, we were excited to be out at Global Water Farms’ pilot site to begin the march towards constructing our first full sized Water Farm! We met up nice and early with our Geotechnical Engineer and Surveyors so as to beat the desert heat. Our time was spent identifying our property boundaries, determining where we are going to site the pilot on the 641 acre plot, and drilling soil samples to determine the geological properties of our pilot site. We even found an existing well head located on our property with a water level only 120′ below grade and a water column of at least 350′. Check back next time as we continue working to cultivate freshwater stability.”